![]() |
|
#16
|
||||
|
||||
|
Nice picture! Wow, cramped little critter!
|
|
#17
|
||||
|
||||
|
Quote:
Although there were some tight and trick spots, The layout made checking B+ voltages very easy and going through the voltage doubler rectifer cap circiut was a snap as i did have to replace the selenium diodes and verify that i got it right the first time around. Stuffing the multi section eletrolytics were also quick and clean, Both caps are sleaved with cardboard covers and i was able to cut the cans close to the base, stuff and pop on the cardboard covers on leaving a factory original look. All in all the job posed some challenges that i was able to overcome, through past expirences and inovative technics i have picked up from others on this forum.
|
|
#18
|
||||
|
||||
|
Great question!
Quote:
In the other GEs i will try two 80uf caps in parallel. On another note i have found a pipe cutter that will open up to 1 1/2 inches and will cleanly cut the aluminum can in two, making resuffing some caps a whole lot easier.
|
|
#19
|
||||
|
||||
|
Thanks for the tips. I have have two of these chassis awaiting restoration. I dug up some 220uf @ 200 volt caps I was going to try. I wonder if that extra capacitance will pose a problem
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|