Seems rather straightforward.
1) Short out peaking coil L28, points C&D.
2) Tune in test pattern, synchronize pic if you can (vertical/horizontal).
3) Turn horizontal hold fully clockwise. Adjust horizontal freq B1, UNTIL you see a single vertical blanking bar, IE a split picture, then turn horizontal hold ¼ turn ccw to get lock, and observe correct picture geometry, and adjust as needed.
This is the first steps, and if these fail, there is a problem that needs to be fixed.
__________________
=^-^=
Yasashii yoru ni hitori utau uta. Asu wa kimi to utaou. Yume no tsubasa ni notte.
いとおしい人のために
Reply With Quote
  #2  
Old 08-27-2024, 01:17 PM
Aperna1985 Aperna1985 is offline
VideoKarma Member
 
Join Date: Feb 2018
Posts: 187
Talking

Quote:
Originally Posted by Yamamaya42 View Post
Seems rather straightforward.
1) Short out peaking coil L28, points C&D.
2) Tune in test pattern, synchronize pic if you can (vertical/horizontal).
3) Turn horizontal hold fully clockwise. Adjust horizontal freq B1, UNTIL you see a single vertical blanking bar, IE a split picture, then turn horizontal hold ¼ turn ccw to get lock, and observe correct picture geometry, and adjust as needed.
This is the first steps, and if these fail, there is a problem that needs to be fixed.

Thank you. I didn't understand what a vertical blanking bar was.

The other thing that has me confused is, L28 is just a simple coil that goes between Pin 7 of V7 (video detector and AGC rectifier 6AL5) and Pin 3 of V8 (12AU7 Video Amp) why does it list terminals C&D as if there are a terminal A&B? Also this coil is under the chassis and I have no acess once the chassis is in the cabinet. So I just put a test lead on each side of the coil, then connected then together so I could try to adjust B1. Is that a good way to do this? I was thinking I could disconnect them if I wanted to check the picture. Or are they talking about shorting both codes of L28 to ground? I haven't tried that, I was afraid to cook something.
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 11:01 PM.



Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
©Copyright 2012 VideoKarma.org, All rights reserved.