Videokarma.org

Go Back   Videokarma.org TV - Video - Vintage Television & Radio Forums > Rectangular Screen Tube Televisions

Notices

We appreciate your help

in keeping this site going.
 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #10  
Old 10-13-2018, 10:07 AM
dieseljeep dieseljeep is offline
VideoKarma Member
 
Join Date: Jul 2010
Posts: 7,562
Quote:
Originally Posted by old_tv_nut View Post
Built in 1975 (started in 74?) - Move-in was in '75 - '76, floor-by floor as the interiors were completed.

It was an unusual building with greater than usual height per story. All electric, with waste heat from the lighting fixtures used as a planned part of winter heating. Ahead of its time: floors were concrete with built in electical run cavities, so electrical power and signal outlets could be placed anywhere by drilling a hole through the floor at the desired point. Whenever space was rearranged, new holes were drilled and the old ones were capped with flush metal caps. One of the most expensive features: Zenith had one of the largest audio anechoic chambers around, built on a separate foundation in the center of the basement. The working "floor" of the chamber was a steel wire mesh at mid height with equal room cavities above and below. With all these precautions, there were still some very low frequency vibrations from traffic on the tollway. Lighting in the building was some of the brightest in any office building, which later became something of an annoyance as more and more work was done on computer monitors.

The building was originally designed to be entirely filled with R&D and have a twin building to the north connected through the lobby. Plans were changed to use the building as both headquarters and R&D, as the Research division was closed in 1975. (Zenith was one of the few TV makers to have a three-tier structure of Research, Advanced Development and Product Development. Only GE outdid this, having a fourth tier of product cost reduction.) The second tower was never built.
The firm I worked at for 33 years, 20 as an Electrician, had the cellular raceways in the concrete floors as stated above and that section was built in 1957, so that concept was around for awhile.
The fourth tier on the GE R&D Product Development structure must've been the busiest because they sure knew how to build products cheap.
Reply With Quote
Audiokarma
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 03:31 AM.



Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
©Copyright 2012 VideoKarma.org, All rights reserved.