![]() |
|
#12
|
||||
|
||||
|
Long pump cycle (Kellers book says 24 hours), low yield, difficult to build and Xray shielding problems I believe, were the major reasons that Westinghouse changed the set design to use a 21CYP22 in 1958. For the CYP sets, the HV was dropped from 25 kV down to 22 kV and the lead shielding on the inside of the cabinet was eliminated and they claimed higher brightness.
jr |
|
|