|
Looking at the chassis tube layout...I see where you need to check for B+. You can either reach it on TOP of the chassis or UNDER It.
Next to the H-put tube...is a terminal strip. The THIRD terminal post is B+. CHeck this to GROUND...and see what it reads. you can ALSO measure this under the chassis, the third termnal is under that black capacitor.
I see what look like a diode under the chassis. It is under that red cap...above the brown tubualr cap--which is likely one of the doubler caps....ASSUMING...this set uses a doubler. The other doubler cap is likely part of the can cap on the right of the chassis.
IF this is a doubler power supply...you should have at least 275-285 volts B+ If NOT a doubler....only 140-150 volts.
|