After a glorious time at the ETF convention, its back home and back to work on the Crosley.
First up is the sweep/power supply chassis. A straightforward recap job. Three of the four electrolytic cans were restuffed. The fourth, a single section 500uF/50V was replaced with an axial electrolytic under the chassis, leaving the old can unconnected but in place for cosmetics.
Now on to the main TV chassis......