View Single Post
  #28  
Old 02-25-2010, 01:39 PM
sean's Avatar
sean sean is offline
VideoKarma Member
 
Join Date: Feb 2004
Location: Sullivan, MO
Posts: 271
I would suggest checking resistances of the windings in the power transformer with the power removed. Make sure they are close to what is shown on the schematic. Also measure resistance from the lead of one winding to one lead of each of the other windings to make sure there are no shorts between windings.

I'm not familiar with the term "PMV" but I would assume that this is what is commonly referred to as a "dim bulb tester"?
__________________
Sean - WØKPX
Reply With Quote