|
You need to set the meter to read ac voltage not vdc when checking the voltage on the primary side of the transformer. Voltages on the primary side of the transformer should be at or near line voltage. The B+ supplies are usually checked at the positive terminals of the main filter capacitors. There will be several B+ supplies. Usually 400V, 395V, 260V, 195V 130V. Something like that anyway. Set the meter to read DC voltage and connect the - lead to chassis ground, then you can touch the + lead to the power supply sources and check the readings. I do not know the chassis number of your set, but the U904 also uses a 6GC5 tube for a voltage divider to derive the 130 volt supply from the 260 volt source. The 395, 260, and 130 volt sources are all used in the sweep section. It would help to know what the chassis number is. I should have the schematic if you can post the chassis number. Check the voltages and componants in the Horiz afc and oscillator circuit for thermal faults. Before it gets hot use a soldering iron to heat the componants and see if that causes it to fail sooner. Be sure to check any high value or high wattage resistors in the sync circuits as well as the HV regulator circuit.
Bill R
|